Material takeoffs
that end in an order.
Yield, waste, bag counts, truckloads and delivered cost — for asphalt, gravel, topsoil and, soon, concrete, lumber and drywall. No account. Works with gloves on.
01Concrete & Masonry
In progress — see the section page.
05Framing & Lumber
In progress — see the section page.
06Drywall & Interior
In progress — see the section page.
Cost guides
Why the “Pro”
01Every result is an order. Tons in ¼-ton steps, bulk yards in ½-yard steps, bags rounded up — with waste already in.
02Real densities and yields. 145 lb/ft³ compacted HMA, 1.4 t/yd³ for #57, 0.75 ft³ per 40 lb bag of topsoil — editable, never hidden.
03Built for the tailgate. Big targets, black on white, fractions accepted. Works without JavaScript. No account, no popups.
6 calculators · 3 cost guides · 45 pages