Concrete to set fence, deck and mailbox posts. The hole should be three times the post width and a third of the post’s length deep (or below frost). The post displaces concrete, so the calculator subtracts it — a 4×4 in a 10″ × 30″ hole is about two 80 lb bags.

3 × post width
⅓ of post length · below frost line
4×4 = 3.5″ · 6×6 = 5.5″
Waste
Order · incl. wasteCONCRETE · post-hole
0.38yd³

Buy 17 × 80 lb bags — under 1 yd³ bagged mix beats a short load.

Net volume (9.2 ft³)
0.34 yd³
Waste 10%
+ 0.03 yd³
Ready-mix ticket
0.50 yd³
Approx. weight
1,381 lb
What to buy
80 lb bags
17
60 lb bags
23
40 lb bags
34
Est. delivered
Materials + delivery$6–$9 / bag · Sep 2026
$102 – $153
Installed (with labor)typ. $363
$252 – $528
Shop this ticketThe Home Depot

Quantities follow the ticket. Links may earn us a commission at no cost to you; they never change a number.

How to calculate post hole by hand

Per hole (ft³) = π × (Hole dia ÷ 24)² × Depth (ft) − (Post width ÷ 12)² × Depth (ft) · bags = ft³ ÷ 0.60

Worked example

  1. Hole: π × (10 in ÷ 24)² × 2.5 ft = 1.36 ft³.
  2. Post: (3.5 in ÷ 12)² × 2.5 ft = 0.21 ft³.
  3. Concrete per hole: 1.36 − 0.21 = 1.15 ft³ → 1.9 × 80 lb bags, call it 2.
  4. Eight posts: 9.2 ft³ + 10% = 10.1 ft³ → 17 × 80 lb bags (0.37 yd³).
Field reference
4×4 post, 10″ × 30″ hole
≈ 2 × 80 lb bags
4×4 post, 12″ × 36″ hole
≈ 3 × 80 lb bags
6×6 post, 12″ × 36″ hole
≈ 2.5 × 80 lb bags
6×6 post, 18″ × 42″ hole
≈ 7 × 80 lb bags

Questions crews ask

How many bags of concrete do I need per fence post?

For a 4×4 post in a 10″ wide, 30″ deep hole, about 1.15 ft³ of concrete — two 80 lb bags, or three 60 lb, or four 40 lb. A 6×6 in a 12″ × 36″ hole needs about 2.5 × 80 lb bags. Round up per hole, not just in total.

How big should a post hole be?

Three times the post width in diameter (10–12″ for a 4×4, 16–18″ for a 6×6) and one-third of the post’s total length deep — 24–30″ for a 6 ft fence, 36″+ for gate posts — and always below the frost line. Flare or bell the bottom for uplift resistance.

Do I mix the concrete or pour it dry?

Fast-setting mix (Quikrete Fast-Setting, Sakrete Fast Set) is designed to be poured dry around the post and watered in — about a gallon of water per 50 lb bag — and sets in 20–40 minutes. Standard mix should be mixed first. Either way, set the post on 6″ of gravel so the end drains.

How much concrete for a 6x6 post?

In a 12″ × 36″ hole: hole 2.36 ft³ minus post 0.63 ft³ = 1.73 ft³ → 3 × 80 lb bags. In an 18″ × 42″ hole for a gate or deck post: 6.2 − 0.74 = 5.4 ft³ → 9 × 80 lb bags. Above about 30 holes it is a short-load ready-mix job.

Should the concrete come above grade?

Yes, crown it an inch above grade and slope it away from the post so water sheds. Concrete stopped below grade forms a cup that holds water against the wood and rots the post at the ground line.