Aggregate & Stone / Sand

Sand Delivery Cost Calculator

Bulk sand by the ton, delivered. Enter your yard’s per-ton quote to replace the national range.

1″ paver bedding · 2″ under pool · 6″+ fill
Waste
Your pricesdefaults: US national averages, Sep 2026

Leave blank to use the national range. Enter your plant or crew quote to replace it.

Material orderSAND · 24×24 ft × 2″
5.0tons

Order 5.25 t — yards sell sand by the ton or ½ ton; most have a 1-ton minimum.

Area
576 ft²
Volume (96.0 ft³)
3.56 yd³
Net weight @ 1.35 t/yd³
9,600 lb · 4.80 t
Waste / settling 5%
+ 0.24 t
Order quantity
5.04 tons
Truckloads
1 × tri-axle dump (≈20 t)
Metric
2.72 m³ · 4.57 tonnes
Bagged instead
50 lb bag (0.5 ft³)
202 bags
Estimated costUS national averages · Sep 2026
$292 – $602
typ. $421
Masonry sand, at the yard5.25 ton × $25–$60
$131
$210
$315
Delivery (per load)min. $85
$85
$85
$85
Spread & level5 ton × $15–$40
$75.60
$126
$202
Estimated total$0.51–$1.04 / ft² installed
$292
$421
$602
Get 3 local quotes for this job Free · no obligation · your quantities go with the request
Shop this ticketThe Home Depot

Quantities follow the ticket. Links may earn us a commission at no cost to you; they never change a number.

Get 3 quotes for this sand job

The estimate above is a national range. A local aggregate & stone contractor who sees your site can give you a firm price, and comparing 3 bids is the single biggest lever on what you pay. Tell us where the job is and we will match you with up to 3 contractors who serve your ZIP.

  • Your quantities and this estimate go with the request, so you are not starting over.
  • No account, no app. Contractors call or text you directly.
  • One request. We do not resell your details beyond the matched contractors.
optional
optional

How to calculate sand by hand

Tons = Length (ft) × Width (ft) × Depth (in) ÷ 12 ÷ 27 × 1.35 t/yd³

Worked example

  1. Area: 20 ft × 10 ft = 200 ft².
  2. Volume: 200 ft² × (2 in ÷ 12) = 33.3 ft³ = 1.23 yd³.
  3. Weight: 1.23 yd³ × 1.35 t/yd³ = 1.67 tons.
  4. Waste 5%: 1.67 × 1.05 = 1.75 tons → order 1.75 tons.
  5. Bagged: 35 ft³ ÷ 0.5 ft³ = 70 × 50 lb bags.
Field reference
1 ton of sand at 1″ deep
≈ 240 ft²
1 ton of sand at 2″ deep
≈ 120 ft²
1 yd³ of dry sand
≈ 2,700 lb · 1.35 t
50 lb bag
≈ 0.5 ft³

How we price this

The low, typical and high columns are the 20th, 50th and 80th percentile of published us national averages for masonry sand, at the yard, delivery and labor. They are estimates for budgeting, not quotes — enter your own supplier and crew prices above to replace them. Ranges are re-checked monthly; see the methodology page for how every number on this site is derived.

Questions crews ask

How much does a ton of sand cost?

Masonry and fill sand run $25–$60 per ton at the yard; washed play sand and coarse concrete sand $35–$70. Delivery adds $50–$150 per load, so a 3-ton order lands at $150–$350.

How much is a yard of sand?

A cubic yard weighs about 1.35 tons, so at $40 per ton a yard is roughly $55 before delivery. Bagged play sand is far more — $5–$7 per 50 lb bag is $270–$380 per yard.

How much sand fits in a pickup?

About ½ cubic yard (1,350 lb) in a half-ton pickup, a full yard in a ¾-ton. Sand is heavy for its volume — do not fill the bed.