How Much Limestone for a 20×40 Driveway?

A 20 × 40 ft driveway (800 ft²) at 4″ deep needs 15.8 tons of crushed limestone — 9.88 yd³ net plus 10% waste. Order 16.00 t — quarries sell by the ton; a tri-axle carries about 20 tons per load.

20×40 at other depths

DepthVolumeOrder (tons)50 lb bag (0.5 ft³)
2″ 4.94 yd³ 7.9 tons 294
4″ (this page) 9.88 yd³ 15.8 tons 587
6″ 14.81 yd³ 23.6 tons 880

Other driveway sizes

2″ top course · 4″ base · 6″ driveway base
Compaction + waste
Material orderLIMESTONE · 20×40 ft × 4″
15.8tons

Order 16.00 t — quarries sell by the ton; a tri-axle carries about 20 tons per load.

Area
800 ft²
Volume (266.7 ft³)
9.88 yd³
Net weight @ 1.45 t/yd³
28,642 lb · 14.32 t
Waste / settling 10%
+ 1.43 t
Order quantity
15.75 tons
Truckloads
1 × tri-axle dump (≈20 t)
Metric
7.55 m³ · 14.29 tonnes
Bagged instead
50 lb bag (0.5 ft³)
587 bags
Est. delivered
Materials + delivery$25–$55 / ton · Sep 2026
$485 – $965
Installed (with labor)typ. $1,087
$721 – $1,595
Shop this ticketThe Home Depot

Quantities follow the ticket. Links may earn us a commission at no cost to you; they never change a number.

What will this limestone job cost?

See the installed price range for these quantities and get up to 3 quotes from local contractors. Free, no obligation.

Cost + local quotes →

Different size or depth?

Open the full limestone calculator to change every input, pick a material and see truckloads.

Limestone calculator →

How to calculate crushed limestone by hand

Tons = Length (ft) × Width (ft) × Depth (in) ÷ 12 ÷ 27 × 1.45 t/yd³

Worked example

  1. Area: 50 ft × 12 ft = 600 ft².
  2. Volume: 600 ft² × (4 in ÷ 12) = 200 ft³ = 7.41 yd³.
  3. Weight: 7.41 yd³ × 1.45 t/yd³ = 10.7 tons.
  4. Compaction and waste 10%: 10.7 × 1.10 = 11.8 tons → order 12 tons, one tri-axle load.
Field reference
1 ton #57 limestone at 4″
≈ 56 ft²
1 ton #57 limestone at 2″
≈ 112 ft²
1 yd³ crushed limestone
≈ 2,900 lb · 1.45 t
Tri-axle dump
≈ 20 tons

Questions crews ask

How much limestone do I need for a driveway?

Square feet × depth in inches ÷ 324 gives cubic yards; × 1.45 gives tons. A 12 × 50 ft driveway at 4″ of #57 is 7.4 yd³ ≈ 10.7 tons; order 12 with compaction. For a new driveway lay 4–6″ of ¾″ minus first, then 2″ of #57.

How much does a ton of limestone cover?

About 56 ft² at 4″ deep, 75 ft² at 3″ and 112 ft² at 2″ for #57. Limestone is a little denser than granite gravel, so a ton covers slightly less than the 1.4 t/yd³ figures used for generic gravel.

What is #57 limestone used for?

#57 is ¾″ washed stone with no fines: driveway top course, drainage around pipes and foundations, under slabs and in French drains. It stays loose and drains. For a base that locks together use ¾″ minus or screenings.